Lincoln Electric
8 Enterprise Cres., Waterdown, ON
Project Type:
Uncategorized

Description
Location: 8 Enterprise Cres., Waterdown, ON
Vicano partnered with Lincoln Electric to deliver a purpose-built manufacturing and automation facility designed to advance the future of structural steel fabrication. Encompassing 96,000 square feet, the building provides the specialized infrastructure required to produce Lincoln Electric’s PythonX robotic plasma cutting systems—equipment that has redefined how structural steel is processed around the world. High-capacity crane bays, 28-foot clear heights, and a robust slab-on-grade foundation support the handling and assembly of large steel components with precision and safety in mind.